Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1460.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Oct 07, 2021     Oil cooler installation - (5 hours)       Category: Engine
Assembled and installed oil cooler to the firewall. One mounting bolt was impossible to install due to limited access. Just couldn't get it to engage in the nut plate. Ended up removing the nut plate to be able to use a standard nut on the backside. Struggled with hole alignment and nut plate engagement on all holes. Hope I never have to take the oil cooler off. Added an angle from the firewall to the forward edge of the oil cooler to ensure support.


 